LOS ANGELES — AECOM, a premier, fully integrated global infrastructure firm, announced today that it has begun construction of a battery Energy Storage System (BESS) at Fort Carson, Colorado, using Lockheed Martin’s (NYSE: LMT) GridStar® Lithium energy storage system. The 4.25 MW/8.5 MWh BESS is part of an energy savings […]